The Glen Rose Management Team have completed an initial engineering study that indicates the field only requires the addition of pressure in order to establish meaningful long term production.


Pressure will be introduced via injection. The most efficient method will be established by a pilot project on 1.5 – 2.5 acre spacing consisting of 13 wells (4 injectors and 9 producing gathering wells).